Fire ravages the Roseton Electric Generating Plant in Newburgh, N.Y. the night of March 18, 1993, the heat from the fire is so intense that cables and equipment melt and are excessively damaged. The following day at 10 a.m. Perreca mobilizes management, supervision and electricians onsite to begin assessment of damage and plan for repairs.

IBM takes another technological step forward, expanding its East Fishkill, N.Y. plant so it can outfit an experimental particle beam accelerator.  Perreca Electric Co. is there to supply power and control wiring.  

Holiday Inn in Fishkill, N.Y. is constructing a new 40,000-square-foot banquet facility, and it wants to make sure that the wiring is a flawless as the parties they will host.  They call Perreca Electric Co.

Power plants.  Particle accelerators.  Banquet halls.  Nursing homes.  Hospitals.  Banks. Airports.  Colleges.  What do they have in common?  The people running them did not want to take chances with the future of their business.  So they all called Perreca.

Our highly trained workforce puts us above the competition.  The job is done right the first time, preventing labor and cost overruns that are the millstone around every business' neck.

520 Broadway PO Box 2530 Newburgh, NY 12550 Tel. (845) 562-4080 Fax (845) 562-0801
Copyright © 2000 - 2010 Perreca Electric Co., Inc. All Rights Reserved. Hosting and Content Management provided by NeoCurve, LLC